A FAULT DETECTION AND PROTECTION SCHEME FOR A 200 MVA TRANSFORMER USING FUZZY LOGIC – complete project material

[ad_1]

A FAULT DETECTION AND PROTECTION SCHEME FOR A 200 MVA TRANSFORMER USING FUZZY LOGIC

ABSTRACT

Condition monitoring of Electrical power equipment has attracted considerable attention for years. The aim of this work is to use Fuzzy logic (FL) Tool Box in building a simulation system that will diagnose all kinds of incipient faults, phase to phase fault and overloading in a transformer and monitor its conditions. Current and rate of change of current with time have been identified as the input variables, duly represented in the programme as “Error” and “Error-Dot”. These variables have their universe of discourse from -1.5 to 1.5 and from -10 to 10 respectively. Fuzzy logic sensor is designed to monitor the current(i) conditions of the transformer at both ambient and full load. The results from the research show that whenever the output response is zero the current in transformer is normal. This is obtained when input values of [0] and [0] are injected into the system to produce a response of “6e-017” which is approximately zero. Whereas if the output response is greater than zero it implies that the transformer current is rising beyond normal and protection scheme should be alerted. This condition is achieved when input values of [-1.5] and [5] are used on the system to give a response of “+5”. However, if the response is less than zero then the transformer current is below normal, hence the protection scheme should be alerted.  To investigate this, input values of [1.5] and [-5] give a response of “-5”. Fuzzy logic is used as an expert system that assesses all information keyed in at the front panel to analyze and predict the condition of the transformer at any time.

This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – admin@freeresearchproject.com.ng and actions will be taken immediately. Thank you.

[ad_2]


Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.


The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

  • Contains 50,000 project topics.
  • With complete project materials.
  • Contains 73 departments.
  • Completely offline, No internet needed.
  • Updated Monthly with new project topics & departments.
  • Easy to navigate and search projects.
  • Easily shareable via Xender, Bluetooth, etc.
  • Easy project support from inside the App.
  • Universities, Polytechnics & Colleges of Education.
INSTALL NOW

0/5 (0 Reviews)
Read Previous

INFLUENCE OF PARENTAL BACKGROUND ON ACADEMIC ACHIEVEMENT OF PRIMARY SCHOOL PUPIL IN ENGLISH LANGUAGE IN ENUGU NORTH EDUCATIONAL ZONE – complete project material

Read Next

FINANCIAL LIBERALISATION POLICY AND THE PERFORMANCE OF THE FINANCIAL SECTOR IN NIGERIA – complete project material

Need Help? Chat with us