ASSESSMENT OF WEIGHT GAIN BETWEEN INDIGENOUS AND EXOTIC BREED OF BROILER – Complete Project Material


TABLE CONTENTS

Approval page

Dedication

Abstract

Acknowledgement

Table of content

CHAPTER ONE

INTRODUCTION

1.1  Relevance of project

1.2  Site inspection

1.3  Evolution of road network in nigeria

1.4  Motor vehicle characteristic that affects road design data

1.6  Reconnaissance survey

1.6.1Chain survey

1.6.2Station marking

1.7  Factors Affecting Choice Of Station

CHAPTER TWO

THEODOLITE TRANSVERSING OF THE ROAD CONTROL

2.1  Definitions

2.2  Thetheodolite

2.3  Theodorite adjustment

2.3.1Temporary adjustment

2.3.2Permanent adjustment

2.4  Procedure for theodolite traversing

2.5Materials used for the theodolte traversinging

CHAPTER THREE

PROJECT FIELD LEVELING WORK

3.1  Leveling

3.2  Profile leveling

3.3  Cross leveling

3.4  Objectives of leveling

3.5  Instruments used in leveling

3.6  Temporary adjustment of leveling instrument

3.7  Definition of some leveling terminologies

3.8  Leveling book

3.9  Earthwork computation

3.9.1Method

CHAPTER FOUR

SOIL ANALYSIS

4.1  Collection and preliminary preparation of samples

4.2  Mechanical analysis

4.3  Atterberg/consistency limit tests

4.3.1Liquid limit test

4.3.2Plastic limit test

4.4  Compaction test

4.5  The California bearing ratio (cbr) test

4.6  Pavement design using cbr

CHAPTER FIVE

GEOMETRIC ELEMENTS DESIGN

5.1  Basic design parameters

5.1.1Design speed

5.1.2Gradient

5.1.3Sight distance

5.2  Curve design

5.3  Curve parameters and formula used, in designing of horizontal curves

5.4  Vertical curve design

5.5  Cross sectional elements of the road

5.6  Brief description on stages of work and equipment used n road constriction

5.7  Summary and conclusion

     Bibliography


Get Complete Project Now »

Talk to us right now: (+234)906-451-7926 (Call/WhatsApp)


Share a Comment


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

PERFORMANCE APPRAISAL OF MONETARY POLICY PF CENTRAL BANK OF NIGERIA – Complete Project Material

Read Next

MORTGAGE BANKING AND HOUSING POLICY IN NIGERIA – Complete Project Material

Need Help? Chat with us