THE EFFECTS OF CONSTRUCTION DELAYS ON PROJECTS DELIVERY IN NIGERIA – Complete project material

[ad_1]

THE EFFECTS OF CONSTRUCTION DELAYS ON PROJECTS DELIVERY IN NIGERIA TABLE OF CONTENTS
Cover Page – – – – – – – – – –
Title Page – – – – – – – – – –
Certification – – – – – – – – – –
Dedication – – – – – – – – – –
Acknowledgement – – – – – – – – –
Abstract – – – – – – – – – –
Table of Content – – – – – – – – –
Chapter One: Introduction
Background of the Study – – – – – –
Statement of the Problem – – – – – –
Objectives of the Study – – – – – – –
Research Questions – – – – – – –
Research Hypotheses – – – – – – –
Significance of the Study – – – – – – –
Scope/ Limitation of the Study – – – – – –
Definition of Terms – – – – – – –
Chapter Two: Review of Related Literature
2.1 Introduction – – – – – – – – –
2.2 Conceptual Framework – – – – – – –
2.3 Theoretical Framework – – – – – – –
2.4 Empirical Review – – – – – – – – Chapter Three: Research Methodology
3.1 Introduction – – – – – – – –
3.1 Research Design – – – – – – – –
3.3 Area of the Study – – – – – – – –
3.4 Population of the Study – – – – – – –
3.5 Sample Size and Sampling Techniques – – – –
3.6 Instrumentation – – – – – – – –
3.7 Validation of the Instrument – – – – – –
3.8 Administration of the Instrument – – – – –
3.9 Method of Data Analysis – – – – – – – Chapter Four: Presentation, Analysis and Interpretation of Data
4.1 Introduction – – – – – – – – –
4.2 Presentation and Analysis of Data – – – – –
4.3 Testing of Hypotheses – – – – – – –
4.4 Discussion of Findings – – – – – – –
Chapter Five: Summary, Conclusion and Recommendations
5.1 Introduction – – – – – – – – –
5.2 Summary – – – – – – – – –
5.3 Conclusion – – – – – – – – –       Abstract
Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays.

GET THE COMPLETE PROJECT»

Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: [email protected]

IF YOU CAN’T FIND YOUR TOPIC, CLICK HERE TO HIRE A WRITER»

Disclaimer: This PDF Material Content is Developed by the copyright owner to Serve as a RESEARCH GUIDE for Students to Conduct Academic Research. You are allowed to use the original PDF Research Material Guide you will receive in the following ways: 1. As a source for additional understanding of the project topic. 2. As a source for ideas for you own academic research work (if properly referenced). 3. For PROPER paraphrasing ( see your school definition of plagiarism and acceptable paraphrase). 4. Direct citing ( if referenced properly). Thank you so much for your respect for the authors copyright. Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: [email protected]

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N4000 ($15) only, To pay with Paypal, Bitcoin or Ethereum; please click here to chat us up via Whatsapp.
You can also call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

APPRAISAL OF THE OFFENCE OF RAPE UNDER NIGERIA LAW – Complete project material

Read Next

The Uneme Noun Phrase – Complete project material

Need Help? Chat with us