REINVIGORATION OF PROJECT WORKS IN NIGERIA THROUGH COMPULSORY GREEN CONSTRUCTION, (CASE STUDY OF LAGOS STATE) – complete project material


REINVIGORATION OF PROJECT WORKS IN NIGERIA THROUGH COMPULSORY GREEN CONSTRUCTION, (CASE STUDY OF LAGOS STATE)

ABSTRACT

Global warming is a serious problem facing the world today as well as the world in the future if left unchecked. In order to stop or avert this problem, our today’s society must change her ways, by learning how to alter what they do or use in order to be less harmful to the environment. Making our buildings and general structural facilities “green” would greatly impact this problem. There are many ways for this to be done and more ways are being developed rapidly. As these new developments arise, the cost reward for green building becomes more logical for the consumer/occupant. Thomas Hartman, a heating, piping and air conditioning specialist stated that ‘a worldwide scientific consensus has established  some potentially catastrophic changes in climate as a result of human contributions to greenhouse-gas emissions which are likely within the next century if the current growth in emissions is not reversed’ (Hartman). Thus, in order for greenhouse gas emissions as well asp other harmful pollutants to be reduced, a great change must be made in the way structures are constructed. Hence, the need for GREEN or environmentally friendly, building construction is becoming very imperative and should be adopted without delay.

This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – admin@freeresearchproject.com.ng and actions will be taken immediately. Thank you.


Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.


The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

  • Contains 50,000 project topics.
  • With complete project materials.
  • Contains 73 departments.
  • Completely offline, No internet needed.
  • Updated Monthly with new project topics & departments.
  • Easy to navigate and search projects.
  • Easily shareable via Xender, Bluetooth, etc.
  • Easy project support from inside the App.
  • Universities, Polytechnics & Colleges of Education.
INSTALL NOW

0/5 (0 Reviews)
Read Previous

ASSESSMENT OF GENETIC (VIA PROTEIN ELECTROPHORESIS) AND NUTRITIONAL VARIABILITIES AMONG TEN ACCESSIONS OF SPHENOSTYLIS STENOCARPA (HOCHT. EX. A. RICH) HARMS – complete project material

Read Next

GENETIC CHANGE IN THE NIGERIAN HEAVY LOCAL CHICKEN ECOTYPE THROUGH SELECTION FOR BODY WEIGHT AND EGG PRODUCTION TRAITS – complete project material

Need Help? Chat with us