1. Home
  2. Civil Engineering

Category: Civil Engineering

A DECISION MODEL FOR THE DESIGN AND OPERATION OF INVENTORY PROGRAMMES IN A MANUFACTURING INDUSTRY – complete project material

[ad_1] A DECISION MODEL FOR THE DESIGN AND OPERATION OF INVENTORY PROGRAMMES IN A MANUFACTURING INDUSTRY ABSTRACT A working inventory model is developed to incorporate the partial back ordering inventory with references to the back…

Read More

AN ANALYSIS OF BEAMS ON NON- HOMOGENEOUS ELASTIC FOUNDATION USING INITIAL VALUE APPROACH – complete project material

[ad_1] AN ANALYSIS OF BEAMS ON NON- HOMOGENEOUS ELASTIC FOUNDATION USING INITIAL VALUE APPROACH ABSTRACT The paper presents an analysis of beams on non-homogeneous elastic foundation, where the deformation is partly localized and partly continuous.…

Read More

COMPARATIVE ANALYSIS OF SOLID WASTES MANAGEMENT PROCEDURES OF SELECTED CITIES IN NIGERIA – complete project material

[ad_1] COMPARATIVE ANALYSIS OF SOLID WASTES MANAGEMENT PROCEDURES OF SELECTED CITIES IN NIGERIA ABSTRACT Solid waste management is widely recognized as a major concern for cities in developing countries with the potential to cause negative…

Read More

BITUMINOUS STABILIZATION OF CLAY SOILS FOR ROAD CONSTRUCTION – complete project material

[ad_1] BITUMINOUS STABILIZATION OF CLAY SOILS FOR ROAD CONSTRUCTION ABSTRACT The rate at which roads fail in Nigeria should worry any responsible citizen. Considering the enormous resource expended to construct a kilometer of road, it…

Read More

BEARING CAPACITY AND CRITICAL NORMAL STRESS DISTRIBUTION OF SOILS BY METHOD OF VARIATIONAL CALCULUS – complete project material

[ad_1] BEARING CAPACITY AND CRITICAL NORMAL STRESS DISTRIBUTION OF SOILS BY METHOD OF VARIATIONAL CALCULUS ABSTRACT A mathematical technique  is hereby advanced for investigating the bearing capacity and associated normal stress distribution at failure of…

Read More

APPRAISAL OF CONSTRUCTION HEALTH AND SAFETY RISK MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY – A CASE STUDY OF THE BUILDING INDUSTRY – complete project material

[ad_1] APPRAISAL OF CONSTRUCTION HEALTH AND SAFETY RISK MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY – A CASE STUDY OF THE BUILDING INDUSTRY ABSTRACT The study examined the state of health and safety risk management practices in…

Read More

ANALYSIS OF TRAFFIC CONGESTION IN ABAKPA–NIKE ROAD NETWORK INTERSECTIONS – complete project material

[ad_1]  ANALYSIS OF TRAFFIC CONGESTION IN ABAKPA–NIKE ROAD NETWORK INTERSECTIONS ABSTRACT Abakpa-Nike is notorious for chaotic traffic due to driver’s indiscipline and poor road network. This study was therefore undertaken to determine the level of…

Read More

ANALYSIS OF SANDCRETE BLOCKS PRODUCTION BY USING DIFFERENT SOURCES OF SHARP SANDS IN SOME PARTS OF SOUTH-EAST GEO-POLITICAL ZONES. CASE STUDY- ENUGU AND EBONYI STATE – complete project material

[ad_1] ANALYSIS OF SANDCRETE BLOCKS PRODUCTION BY USING DIFFERENT SOURCES OF SHARP SANDS IN SOME PARTS OF SOUTH-EAST GEO-POLITICAL ZONES. CASE STUDY- ENUGU AND EBONYI STATE ABSTRACT This study examined the experimental analysis of sandcrete…

Read More

ANALYSIS OF RIGID JOINTED PLANE TRUSS STRUCTURES USING FINITE ELEMENT ANALYSIS TECHNIQUES – complete project material

[ad_1] ANALYSIS OF RIGID JOINTED PLANE TRUSS STRUCTURES USING FINITE ELEMENT ANALYSIS TECHNIQUES ABSTRACT Analysis of plane truss structures based on the assumptions that (1) members are connected at joints by frictionless pins and (2)…

Read More

ANALYSIS OF ORTHOTROPIC PLATES IN FREE VIBRATION REGIME USING RAYLEIGH – RITZ METHOD – complete project material

[ad_1] ANALYSIS OF ORTHOTROPIC PLATES IN FREE VIBRATION REGIME USING RAYLEIGH – RITZ METHOD ABSTRACT The assumed deflection shapes used in the approximate methods such asin the Rayleigh–Ritz method were normally formulated by inspection andsometimes…

Read More
Need Help? Chat with us