ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION) – Complete Project Material


ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION)

(ROAD LINKING FEDERAL SECRETARIAT INDUSTRIAL CENTRE AND MASS COMMUNICATION DEPARTMENT (IMT CAMPUS III), ENUGU)

By

ANYANWU, EZENWA A. CE/H2004/011

Presented To

Department of Civil Engineering

ABSTRACT

The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions.
The need for easing the flow of traffic on this access road shall rise, since it s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no longer in peak condition and a result of traffic growth.
The study modification therefore involves the assessment of the roads present condition, involving carrying out side test, and surveys etc, as to what could be done and how best to enhance traffic flow.

TABLE CONTENTS

Certification
Dedication
Abstract
Acknowledgement
Table of content

CHAPTER ONE

General introduction
Design application
Aim and objective
Advantages of road
Reconnaissance survey
Route survey

CHAPTER TWO
Theodolite transversing of the road control
Importance of theodoversing
Equipment used on traversing
Procedure
Conversion of angles to bearing  (whole area bearing
Rectangular co-ordinate

CHAPTER THREE
Field leveling work general survey
Need for preliminary survey leveling work
Technical term used in leveling
Aim
Application of leveling
Instrument in levelingâ
Operation conditionââ
Leveling of the road
Reduction of filed data
Brief description on profile and cross sectional leveling
Uses of profile plot
Leveling tabulating
Earth work computation

CHAPTER FOUR
Soil identification/laboratory test
Soil identification
Laboratory test performed in soil
Test to be carried out
Soil sampling
Sieve/particles size analysis
Aim and scope
Material and equipment
Test producers
Constancy limits
Liquid limit of soil
Objective and scope
Material and  equipment
Test procedure
Plasticity index
Soil classification based in plasticity
Significance fo the study
Compaction
Objective and scope
Materials and equipment
Test procedure
California bearing ratio (cbr)
Objective scope
Material and equipment
Test procedure
Borrow materials for sub-base
Laboratory test on the borrowed materials
Cbr rating
Tabulation for mechanical analysis

CHAPTER FIVE
Design vehicles
Design speed
Highway capacity
Deign guide
Design period
Basic design element horizontal alignment
Vertical alignment
Vertical curvature
Standard for grade
Co-ordination of vertical and horizontal alignment
Deign of curves
Pavement layers
Pavement design
Design facts the engineer should know for design
Preparation
Pavement widening
Pavement material
Component pavement and their functions
Design of road pavement
Calculation of cbr value
Vertical and horizontal curve design
Design procedure
Services life of pavement
Drainage design
Basic policy on drainage design
Road side drainage channels
Erosion protection
Conclusion and recommendation
Reference


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

THE STRENGTH OF ADVERTISING TO THE DEVELOPMENT OF THE MASS MEDIA ESTABLISHMENT (A CASE STUDY OF NTA) – MASS COMMUNICATION Project Topics – complete project material

Read Next

design and implementation of a computer based quality assurance monitoring system, case study of etisalat – Complete Project Material

Need Help? Chat with us