the water drainage problems – Complete Project Material


THE WATER DRAINAGE PROBLEMS

(A CASE STUDY OF IMT CAMPUS 3 ENUGU)

By

AZUBUIKE MATHEW NWABUEZE CE/N2002/002

Presented To

Department of Civil Engineering

ABSTRACT

This research work on the water drainage problems (A case study of IMT campus 3 Enugu), the scope of this research work covers every activity which has to do with the drainage problems, background to the subject matter, rational for the study and the limitations of the study, the research review as, the related literature about the authors and scholars, facts and opinions. The findings of this study through the further research.

Finally, base on the findings, a numbers of recommendations were made so that campus 3 IMT Enugu should ensure a good water drainage system within the campus to permit a perfect seepage, discharging, flooding of water and effluent.

TABLE OF CONTENTS

Title page

Approval page

Dedication

Acknowledge

Abstract

Table of content

List of table

CHAPTER ONE

1.0 Introduction

1.1 Importance of drainage

1.2 Objectives of study

CHAPTER TWO

2.0 Literature review

2.1 Types of drainage

2.2 Rational formula

2.3 Hydrological circle

2.4 Forms of waste water

2.5 Sources of water

CHAPTER THREE

3.0 Location of IMT campus 3 Enugu

3.1 Sources of waste water in campus3

3.2 Existing drainage systems

3.3 Best hydraulic design

CHAPTER FOUR

4.0 Discussion

4.1 Problems of water drainage and environmental impacts

4.2 Solution to the problems

4.3 Designing and constructional solution

CHAPTER FIVE

5.0 Recommendations

5.1 Conclusion

5.2 Bibliography

Reference


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

0/5 (0 Reviews)
Read Previous

AN EXAMINATION OF THE COMIC ELEMENTS IN WOLE SOYINKA'S THE TRIALS OF BROTHER JERO AND THE LION AND THE JEWEL.. – ENGLISH Project Topics – Complete project material

Read Next

STUDENT EXAMINATION RESULT PROCESSING SYSTEM. HISTORY & INTERNATIONAL RELATIONS Project Topics – Complete Project Material

Need Help? Chat with us