1. Home
  2. project topics in agriculture engineering

Tag: project topics in agriculture engineering

THE EFFECTS OF CATTLE RUSTLING ON SOCIO-ECONOMIC AND POLITICAL DEVELOPMENT OF NIGERIA – Complete Project Material

THE EFFECTS OF CATTLE RUSTLING ON SOCIO-ECONOMIC AND POLITICAL DEVELOPMENT OF NIGERIA CASE STUDY OF GIWA LOCAL GOVERNMENT AREA (2015-2017) Author: Muhammad Sadiq Ali-jos CHAPTER ONE INTRODUCTION 1.1 Background to the Study Cattle rustling have…

Read More

INSTALLATION OF AUXILIARY WATER SUPPLY NETWORK IN THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

CHAPTER ONE 1.0      INTRODUCTION 1.1      BACKGROUND OF THE STUDY Through a constant series of research and development, It was suggested that groundwater is among the purest forms of natural occurring water. Hailstorm G., (2008). Therefore…

Read More

CONSTRUCTION OF BOREHOLE IN AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING DEPARTMENT – Complete Project Material

TABLE OF CONTENT Title page    —       –        –        –        –        –        –        –        –        –        – i      Declaration —        –        –        –        –        –        –        –        –        –        -ii Approval page —   –        –       …

Read More

INSTALLATION OF AUXILARY WATER SUPPLY NETWORK FOR DEPARTMENTAL LAWN – Complete Project Material

ABSTRACT This project was aimed at providing an Auxilary water supply in the Department of Agricultural and Bio-Environmental Engineering. A reconuaissance survey was carried out to determine the route of the pipeline of which white…

Read More

INSTALLATION OF AUXILIARY WATER SUPPLY NETWORK TO THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

TABLE OF CONTENTS Cover page –        –        –        –        –        –        –        –        –        –        i Fly page      –        –        –        –        –        –        –        –        –        –        ii Title page    –        –        –        –       …

Read More

INSTALLATION OF WATER DISTRIBUTION SYSTEM IN THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

TABLE OF CONTENT Tittle page  –        –        –        –        –        –        –        –        –        –        i Declaration –        –        –        –        –        –        –        –        –        –        ii Approval page     –        –        –        –        –       …

Read More

STRATEGIES FOR IMPROVING RICE PROCESSING AND PACKAGING AMONG FARMERS IN EDU, MORO AND PATIGI KWARA NORTH SENATORIAL ZONE, KWARA STATE. – Complete Project Material

TABLE OF CONTENTS Title page                                                                                         i Approval page                                                                                ii Declaration                                                                                      iii Dedication                                                                                       iv Acknowledgment                                                                                      v Table of contents                                                                                     vi Abstract                                                                                           viii CHAPTER ONE :        INTRODUCTION Background of the study                                                                1 Statement of the…

Read More

PRODUCTION PROCESSING AND STORAGE OF TOMATOES IN NIGERIA WAY FORWARD – Complete Project Material

The Complete Project Research Material is averagely 20 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get the…

Read More

PROCUREMENT AND INSTALLATION OF SOME SELECTED METEOROLOGICAL INSTRUMENT – Complete Project Material

The Complete Project Research Material is averagely 34 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get the…

Read More

CONSTRUCTION OF HAND TROLLEY FOR GAS AND ACETYLENE CYLINDER – Complete Project Material

The Complete Project Research Material is averagely 35 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get the…

Read More
Need Help? Chat with us